Independent reference. Not a government website. Guidance, not engineering advice: confirm with your fire marshal.

Requirements

ERRCS requirements by state and jurisdiction

Pick your state, then your county or city. Each page cites the statute or fire marshal document behind every rule.

Updated Changelog

States covered

We publish a state only when we have read its statute or fire code and at least one local fire marshal's documents.

StateLocal pagesConfidenceLast verified
Arizona1lowOct 25, 2026
California4lowOct 25, 2026
Florida17highOct 25, 2026
Texas1lowOct 25, 2026
Washington2highOct 25, 2026

How these pages are built

State pages cover the statute and the state fire code. County and city pages cover what the local fire marshal publishes: signal levels, radio bands, permit steps and acceptance tests. Where a value is not published, the page says so. Each page shows a confidence level: high means we read the rule in the primary document, medium means the document is older or ambiguous, and low means we could not find a primary document and the page is a pointer to the fire marshal only.

How the rules stack up

Three layers decide what a building owes. The model code, usually Section 510 of the International Fire Code, sets a baseline (IFC 510 explained). The state either adopts that code with amendments, as Washington does, or writes its own law, as Florida does. The local fire department sets signal levels, radio bands and permit steps, and many publish their own triggers. When the layers disagree, the local page tells you which document is newer.

Local pages outside Florida

JurisdictionStateWhat the page coversConfidence
San DiegoCaliforniaNew and existing building triggers, signal levels, third-party acceptance testsmedium
Palo AltoCaliforniaSVRIA 700 MHz rules, third-party validation, 24-hour UPSmedium
San FranciscoCalifornia2025 bulletins, high-rise retrofit, system certificationhigh
Los AngelesCaliforniaLAFD Requirement #105 triggers, frequencies, Regulation No. 4 testingmedium
HoustonTexasExemption test, Texas PE plans, registered special inspectorshigh
PhoenixArizonaBenchmark RF test, permits, PE-sealed compliance certificatehigh
Pierce CountyWashingtonProof of coverage before occupancy, Class A boosters onlymedium
SeattleWashingtonNew building triggers, high-rise retrofit, 7-day annual reportsmedium

Not sure where to start? Run the checker or read Does my building need ERRCS?