Florida · city · ERRCS / BDA requirements

ERRCS and BDA requirements in Jacksonville, Florida

Jacksonville requires minimum radio signal strength in all new and existing buildings. An FCC GROL-licensed vendor surveys the building; if levels fall below the city's threshold, a BDA is required. New buildings show compliance as part of permitting.

Last verified Updated Confidence medium5 sourcesChangelog

Guidance, not engineering advice. Rules on this page come from the documents listed under Sources. Confirm with Jacksonville Fire and Rescue Department (JFRD), Fire Marshal and Office of Fire Plans Review before you design, permit or test a system.

Who must comply

State rules apply here too. See Florida statewide rules.

RuleEffectCitationSource
Once a building is substantially complete, or when an existing building is suspected of poor coverage, a qualified FCC GROL-licensed vendor surveys signal levels after notifying the city radio shop.NoteBDA Survey and Installation RequirementsCity of Jacksonville Fire and Rescue Department
TriggerPublished value
Minimum building sizeNot published; confirm with the fire marshal
Minimum storiesNot published; confirm with the fire marshal
Height triggerNot published; confirm with the fire marshal
Below-grade areasNot published; confirm with the fire marshal
Building types namedNot published; confirm with the fire marshal
Existing buildings must retrofitYes
Compliance deadlineNot published; confirm with the fire marshal

The city document predates the 2023 changes to F.S. 633.202(18), and the deadlines it lists (2019, 2022) are out of date. Current state deadlines are on the Florida page.

RequirementValue
Minimum downlink signal-95 dBm
Minimum uplink signal-95 dBm
Delivered audio quality (DAQ)3.0
Coverage, general areas95% of floor area
Coverage, critical areas99% of floor area
Critical areas namedFire command centers, Fire pump rooms, Exit stairs, Exit passageways, Elevator lobbies, Standpipe cabinets, Sprinkler sectional valve locations, Other areas the AHJ deems critical
Public safety radio bands800 MHz P25 (city system: 807-816 MHz base receive, 854.9-861 MHz base transmit)

Inbound: at least -95 dBm with DAQ 3.0. Outbound: at least -95 dBm at the donor site with DAQ 3.0. Donor-to-inside antenna isolation of at least 20 dB, and no more than 15 microseconds of delay. These values come from an older city document; confirm them before design.

Testing

TestWhat the source saysSource
Acceptance testA passing survey is written up by the vendor, signed by the FCC licensee with test data attached, and filed with the Office of Fire Plans Review. A failing survey means a BDA is required.BDA Survey and Installation Requirements
Annual testNot published in the local documents we found; confirm with the fire marshal.None found
Five-year testNot published in the local documents we found; confirm with the fire marshal.None found
Coverage assessment intervalSet by state law: the fire marshal may require an interior coverage assessment no more than once every 3 years for an existing high-rise or an existing building over 12,000 total gross square feet, and once every 5 years for other existing buildings, with exceptions for major alterations, reported radio failures and imminent threats.F.S. 633.202(18)(c)2

Permit and inspection process

  1. Have an FCC GROL-licensed vendor get approval from the city radio shop and survey the building. Building survey requirements
  2. Retrofit systems in existing buildings need a building permit because of the rated enclosures. New buildings that show the enclosures on their plans can pull an associated fire permit instead. Electrical and fire alarm permits may also be needed. Technical information
  3. Use a contractor holding an EC, EF, EY or ES (two-way radio communications enhancement system specialty) license, plus an FCC GROL. License requirement

Ask JFRD for the current version of its requirements; the copy we could read is circa 2020.

Codes and standards referenced

Code or standardEditionSource
Florida Fire Prevention Code (NFPA 1 and NFPA 101, Florida editions), in force statewide8th edition (NFPA 1, Florida 2021 edition), effective December 31, 2023rule
NFPA 1221 and NFPA 72 (as listed in the city document)2016 and 2013 editions in the city document; the 8th edition Florida Fire Prevention Code now governsjax

Notes

The only published copy of Jacksonville's requirements we could find is hosted by a trade group (the Safer Buildings Coalition), not the city, and the document predates the 2020 amendments to F.S. 633.202 (it still quotes the older deadlines). Treat the signal values as a starting point and confirm the current requirements with JFRD.

Questions people ask

What signal does Jacksonville require?

The city document sets -95 dBm inbound and outbound with DAQ 3.0, in 95% of general building areas and 99% of critical areas. It is an older document, so confirm with JFRD before you design.

Who can install a BDA in Jacksonville?

The city lists certified electrical contractors (EC), alarm system contractors (EF or EY) and two-way radio communications enhancement system specialty contractors (ES), with an FCC GROL license.

Do the deadlines in the Jacksonville document still apply?

No. The document cites 2019 and 2022 dates from an older version of the statute. Current state law set January 1, 2024 (permit) and January 1, 2025 (compliance) for existing high-rises.

Sources

Primary documents we read for this page. Rules change; confirm with your fire marshal (AHJ).

  1. Florida Statutes 2026, section 633.202, subsection (18), The Florida SenateVerified October 25, 2026 · statute
  2. Florida Fire Prevention Code, 8th edition: Florida amendments to NFPA 1 (2021 edition), sections 11.10.2 and 11.10.2.1, Florida Division of State Fire MarshalVerified October 25, 2026 · code
  3. Rule 69A-60.003, F.A.C.: NFPA 1, the Fire Code, Florida 2021 edition, adopted (effective 12/31/2023), Florida Department of State, Florida Administrative CodeVerified October 25, 2026 · rule
  4. City of Jacksonville BDA Survey and Installation Requirements (Office of Fire Plans Review, circa 2020; hosted by a third party, the Safer Buildings Coalition; predates the 2020 statute amendments), City of Jacksonville Fire and Rescue DepartmentVerified October 25, 2026 · ahj document
  5. Fire and Rescue Plan Review Procedures, City of JacksonvilleVerified October 25, 2026 · ahj page